VSM in the Service environment
Case study: Medical billing company wants to improve the utilization of employees and improve their resolution time of the claims.
Step 1: Write down the Process Steps (As-Is)
Step 2: Enter the PR (effort) for each step and capture the no. of outstanding req. at each stage.
Step 3: Note the Agents and Waiting Time at each stage.
Step 4: Enter the Individual and Summary table.
Step 5: Kaizen Burst (identify the improvement)
-----------
3 Step approach to reduce NVA in the Service industry:
Eliminate > Improve> Automate
----------
Create Flow and Respond to Pull
Create flow:
Value Stream Design (VSD).
Single Piece Flow
SMED
Line Balancing
Respond to Pull:
Kanban
Just-In-Time (JIT)
Heijunka (Production leveling)
-------------
Additional Lean Tools
Spaghetti Diagram
TPM (Total Productive Maintainance)
OEE (Overall Equipment Effectiveness)
OEE 6 big losses
ANDON
Visual Factory
Visual management
Gemba
Hoshin Kenri (Policy Deployment)
Cellular Manufacturing
No comments:
Post a Comment